This U-shaped approximately 150' ft. automation line would be typically moved in 20 or more sections. By using creative thinking, diggins & ROSE was able to move this unit in only 3 sections using 53' moving vans, saving days of disassembly at origin and days of reassembly at destination. By shipping the unit on tri-wheel dollies, the units were able to be off-loaded at destination with minimal effort and expense.
- One section of the original "U"-shaped automation line. The full line stretched 150' around the factory floor.
- Instead of this line having to be broken into 8 or more sections, diggins and ROSe riggers were able to safely move it in only 3 sections. Each section was placed on tri-wheel dollies and moved with the dollies in place.
- Each section was secured and blocked into a 53' moving van, still on the tri-wheel dollies.
- Finally each 50' unit was secured into the van with logistics straps to be ready for transport.
Back to previous page.
|